Place of Origin: | China |
Brand Name: | Yashang |
Certification: | ISO, CE, TUV, COC, SONCAP etc. |
Model Number: | JD54 |
Minimum Order Quantity: | Negotiable |
---|---|
Price: | Negotiable |
Packaging Details: | membrane film, PVC bags, steel cages |
Delivery Time: | 15 days |
Payment Terms: | T/T, L/C, Western Union |
Supply Ability: | 5000~10000sqm per month |
Profile: | Aluminum Profile | Cover: | Polyester Fabric |
---|---|---|---|
Colour: | White | Decoration: | Luxury Linings |
Roof Style: | High Peak | Fixing: | Steel Nails Or Expansion Crews |
High Light: | high peak pole tent,high peak marquees |
The high peak tent 5x5m is designed for events with the top height of 2.4 meters, which is top enough for you to decorate the roof lining. With the installation support of installation instrutional manual & video, you can erect up the high peak tent fast and easily.
Please contact with us directly to learn about the detailed specification of different tent projects, because the data in the form may not be updated in time.
Roof Style: | High Peak | Tent Materials: | Hard extruded aluminum alloy (framework) |
Tent Size: | 5x5m | Polyester textile fabric cover (top and wall) | |
Side Height: | 2.4m | Galvanized steel (connecting parts) | |
Top Height: | 5.1m | Tent Configurations: | Aluminum framework |
Bay Distance: | / | Fabric roof cover | |
Longest Part: | 4.9m | Tent Packaging: | Membrane film for long aluminum parts |
Roof Pitch: | 20° | PVC bags for fabric parts | |
Main Profile: | 64.5x64.5x2mm/100 x 48 x 3mm | Steel cages for steel parts | |
Gable Post Profile: | / | Tent Fixing Solution: | Expansion screws for concrete ground (standard) |
Purlin Profile: | 40 x 40 x 2mm | Steel peg nails for soft grass/sand land (optional) | |
Hang Tube Profile: | / | Load Plate for undamagable ground (optional) | |
Snow Load: | 0.05kN/m2 | Installation Support: | Installation instructional manual & video |
Wind Load: | 0.3kN/m2 | On-site installation guide | |
Tent Gross Weight: | 180kgs/240kgs | Factory installation training | |
Tent Total Volume: | 0.4cbm/0.5cbm | Free Tools Configured: | Spanner, Hammers, Ladders |
Tent Lifespan: | Aluminum part ≥ 10~15 years | Setup Time: | 4 people 2 to 3 hour |
PVC fabri ≥ 3~5years | Tent HS code: | 6306220090 |
With the main profile of 64.5x64.5x2mm/100 x 48 x 3mm, the structure is sturdy, it can withstand the snow load of 0.05kN/m2 and wind load of 0.3kN/m2. Besides, the quality material has long service life, whose aluminum part can last 10-15 years and pvc fabric can last at least three years.
In this project, the high peak tent is equipped with white fabric roof lining and wall lining, which makes the atmosphere more comfortable. To adopt natural light, the fabric wall is equipped with plenty of transparent windows, through which you can enjoy the beautiful sceney outside. Besides, the cassette floor is put on the ground. In addition, to provide a stage for the event, a deck in brown fabric is set in the front of the interior space. There are many more decoration plans, so your high peak tent must be full of wow factors.
All aluminum high peak tent will arrive you in good condition: Membrane film for long aluminum parts, PVC bags for fabric parts, Steel cages for steel parts. Drawing on more than 12 years' rich experience and great expertise in designing and manufacturing aluminum tents, Yashang tents are made in China with quality performance materials.
Any more idea about the aluminum high peak tents? Contact us!
Address: Rm.601, 6/F, Bldg#D, Bantian International Center,No.8 Huancheng Road, Longgang District, Shenzhen
Factory Address:5th Lane, Baigongao Industrial Zone, Guanlan Town, Longhua New District, Shenzhen